Water and Wastewater Projects
Client:
Industry:
Division:
Size:
Schedule:
Region:
Description:
Client:
Industry:
Division:
Size:
Schedule:
Region:
Description:
(1) 3.7 Million Gallon Steel Ground Storage Tank with foundation
(1) 1.5 Million Gallon Steel Clearwell with foundation
(1) New brick and mortar chemical induction building
All piping, electrical, controls, and equipment installation
Client:
Industry:
Division:
Size:
Schedule:
Region:
Description:
Water Treatment Plant Upgrades
(1) Pre-stressed Concrete Tank
Expansion of existing water treatment building
All concrete, electrical, piping and control work






Client:
Industry:
Division:
Size:
Schedule:
Region:
Description:
(1) Booster Pump Station
Project took place in an existing neighborhood
Required partial excavation of a hill
Installation of building block and masonry building
Installation of all pumps, piping and controls, including electrical work
Client:
Industry:
Division:
Size:
Schedule:
Region:
Description:
MIEX Pretreatment Facility
First MIEX Pretreatment Facility in the state of Alabama and Third in the country
Advance Tank was awarded an AGC builders award for the work on this project
Construction of (1) building
Installation of all MIEX equipment and controls
Installation of all piping, electrical, and concrete
Client:
Industry:
Water / Wastewater
Division:
Hydro Construction
Size:
>1.5 Million
Schedule:
Staged over 6 months
Region:
Nebraska / West
Description:
Construction of (2) 74' diameter x 33' tall cone roof tanks
Construction of (2) 74' diameter ringwall foundations
Construction of (2) Valve Vaults
Construction of (1) Pump House
Instalation of Yard Piping and Electrical