Case Study - Water Storage

Subdivision development is a complex task involving numerous municipal and private sub-contractors. The water storage portion of a project usually gets thrown into the pile of management tasks for the general contractor. A single bid seems like the easiest thing to do.
But in the case of water storage projects, this answer is not necessarily easy in the long run, nor is it the least expensive. It’s only a matter of time before you experience disasters with mis-managed water storage systems: peeling paint, overtime spent managing details, cost over-runs because of poorly-quoted work. Because a water storage tank and its infrastructure are complex and multifaceted, they demand the attention of an experienced storage contractor.

ATC: Water Storage System Specialists
Although the storage tank is the cornerstone of a water project, it is what happens throughout the construction process that separates the successful projects from the disasters. Advance Tank Construction has been building fresh water storage systems since 1968. We know how to work to the specifications of water system design engineers and municipalities, bringing their concepts to fruition within budget and on schedule with the quality required by a public works project.

Because we are a construction company first, we are ready to take responsibility for everything between the incoming and outgoing pipe: from tank design and fabrication to the expert preparation and application of the best products that are so critical to a lasting, aesthetic paint job.

Breadth of Experience in the Western U.S.
Nevada. Colorado. New Mexico. California. The Dakotas.
Small towns. New developments. The largest cities in the Western United States.

ATC has experience with a broad range of projects across the expanse of the Western United States. We have built single tank systems for rural villages like Severence, Colorado with a population under 600. We have managed the construction of storage infrastructures for cities like Henderson, Nevada, population 176,000. And we have constructed multiple tank systems for Los Angeles Power and Light. We bring the highest quality standards to the smallest projects and our expertise in complex systems to the largest.

Bonded QualityConstructTM Process
ATC key to quality is our proprietary, bonded, three-phase construction process: QualityConstruct™ This unique process gives you the assurance that your welded plate steel water storage systems will be constructed quickly, safely, and in compliance with your specifications.

  • In Phase 1, Pre-site Preparation, we design the storage tanks to your requirements and verify our understanding of the complete storage system design to eliminate surprises during construction.
  • After mobilizing prefabricated parts, construction supervisors and local labor to the storage site, we enter the build phase: Safe Construct On-site Construction.
  • In Phase 3 we complete the critical finishing touches such as painting that will reflect the pride of the community and the quality of the project.

From tank design to system construction management, ATC rises to your expectation.
Couldn’t you use one less thing to worry about? Talk to us today about bidding on the storage system for your community’s most precious commodity: fresh water.