|
Case Study - Water Storage
Subdivision
development is a complex task involving numerous municipal and private
sub-contractors. The water storage portion of a project usually gets
thrown into the pile of management tasks for the general contractor.
A single bid seems like the easiest thing to do.
But in the case of water storage projects, this answer is not necessarily
easy in the long run, nor is it the least expensive. It’s only
a matter of time before you experience disasters with mis-managed water
storage systems: peeling paint, overtime spent managing details, cost
over-runs because of poorly-quoted work. Because a water storage tank
and its infrastructure are complex and multifaceted, they demand the
attention of an experienced storage contractor.
ATC:
Water Storage System Specialists
Although
the storage tank is the cornerstone of a water project, it is what happens
throughout the construction process that separates the successful projects
from the disasters. Advance Tank Construction has been building fresh
water storage systems since 1968. We know how to work to the specifications
of water system design engineers and municipalities, bringing their
concepts to fruition within budget and on schedule with the quality
required by a public works project.
Because
we are a construction company first, we are ready to take responsibility
for everything between the incoming and outgoing pipe: from tank design
and fabrication to the expert preparation and application of the best
products that are so critical to a lasting, aesthetic paint job.
Breadth
of Experience in the Western U.S.
Nevada. Colorado. New Mexico. California. The Dakotas.
Small towns. New developments. The largest cities in the Western United
States.
ATC
has experience with a broad range of projects across the expanse of
the Western United States. We have built single tank systems for rural
villages like Severence, Colorado with a population under 600. We have
managed the construction of storage infrastructures for cities like
Henderson, Nevada, population 176,000. And we have constructed multiple
tank systems for Los Angeles Power and Light. We bring the highest quality
standards to the smallest projects and our expertise in complex systems
to the largest.
Bonded
QualityConstructTM Process
ATC key to quality is our proprietary, bonded, three-phase construction
process: QualityConstruct™ This unique process gives you the assurance
that your welded plate steel water storage systems will be constructed
quickly, safely, and in compliance with your specifications.
- In
Phase 1, Pre-site Preparation, we design the storage tanks to your
requirements and verify our understanding of the complete storage
system design to eliminate surprises during construction.
- After
mobilizing prefabricated parts, construction supervisors and local
labor to the storage site, we enter the build phase: Safe Construct
On-site Construction.
- In
Phase 3 we complete the critical finishing touches such as painting
that will reflect the pride of the community and the quality of the
project.
From
tank design to system construction management, ATC rises to your expectation.
Couldn’t you use one less thing to worry about? Talk to us today
about bidding on the storage system for your community’s most
precious commodity: fresh water.
|