Industrial Projects
Client:
Industry:
Division:
Size:
Schedule:
Region:
Western United States
Description:
(1) 130' Diameter secondary bottom in an open top pontoon floater
Client:
Industry:
Petrochemical - Refining
Division:
Size:
Schedule:
Region:
Description:
Advance Tank performed an in-service seal repair on a wastewater tank. Our crews performed all work while utilizing 100 percent fresh air; this protected them from the very high levels of H2S present on the roof. All work was also performed using anti spark tools due to the high LEL levels on top of the external floating roof.
Client:
Industry:
Division:
Size:
Schedule:
Region:
Description:
Client:
Industry:
Division:
Size:
Schedule:
Region:
Description:
PHASE ONE
Construction of (1) 15' x 32' URT
Construction of (2) 34' x 32' URT
Construction of (4) 48' x 32' URT
PHASE TWO
Construction of (1) 15' x 32' URT
Construction of (2) 34' x 32' URT
Construction of (1) 48' x 32' URT
Client:
Industry:
Petrochemical - Refining
Division:
Size:
Schedule:
Region:
Description:
(1) 80' diameter x 50' Open Top Tank with a pontoon floating roof
(1) 20' diameter x 20' Cone Roof Tank
Client:
Industry:
Liquid Terminal
Division:
Maintenance and Repair
Size:
Less than $250,000
Schedule:
3 weeks from contract execution to completion
Region:
Midwest
Description:
Remove and replace (1) 60’ diameter carbon steel bottom
Client:
Industry:
Liquid Terminal
Division:
Industrial Services
Size:
$2-3M
Schedule:
Region:
Gulf Coast
Description:
Demolition of (2) 48' diameter x 48' 316L stainless steel tanks
Demolition of (1) 48' diameter x 48' 316L stainless steel tank
Construction of (2) 48' diameter x 48' 316L stainless steel umbrella roof tanks
Construction of (1) 58' diameter x 48' 316L stainless steel umbrella roof tanks
Client:
Industry:
Power Plant
Division:
Industrial Services
Size:
> $10M
Schedule:
18 months
Region:
Texas
Description:
Construction of (1) Stack Liner - 28' diameter x 331' tall
Construction of (6) Tanks, varying size
Construction of (3) Clarifiers, varying sizes
Construction of (6) Coal Silos, varying sizes
Construction of (2) Bins, varying sizes


Client:
TIC Construction
Industry:
Bio Fuels
Division:
Industrial Services
Size:
> $10M
Schedule:
12 months
Region:
Upper Midwest
Description:
Construction of a 7,200 barrel/ft day Ethanol plant